home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / SPACEDIG / V12_5 / V12_534.TXT < prev    next >
Internet Message Format  |  1991-06-28  |  17KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from beak.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/wbDYtry00VcJQ6q04S>;
  5.           Mon, 12 Nov 1990 02:25:45 -0500 (EST)
  6. Message-ID: <wbDYtOy00VcJM6oE5F@andrew.cmu.edu>
  7. Precedence: junk
  8. Reply-To: space+@Andrew.CMU.EDU
  9. From: space-request+@Andrew.CMU.EDU
  10. To: space+@Andrew.CMU.EDU
  11. Date: Mon, 12 Nov 1990 02:25:15 -0500 (EST)
  12. Subject: SPACE Digest V12 #534
  13.  
  14. SPACE Digest                                     Volume 12 : Issue 534
  15.  
  16. Today's Topics:
  17.               Ulysses Update - 11/06/90
  18.        Re: You Can't Expect a Space Station to be Cheap
  19.             Re: Galileo Update - 11/06/90
  20.               Magellan Update - 11/06/90
  21. Re: LLNL Astronaut Delivery (was Re: You Can't Expect a Space Station)
  22.              Re: LLNL Astronaut Delivery
  23.            Payload Status for 11/05/90 (Forwarded)
  24. Re: LLNL Astronaut Delivery (was Re: You Can't Expect a Space Station)
  25.  
  26. Administrivia:
  27.  
  28.     Submissions to the SPACE Digest/sci.space should be mailed to
  29.   space+@andrew.cmu.edu.  Other mail, esp. [un]subscription notices,
  30.   should be sent to space-request+@andrew.cmu.edu, or, if urgent, to
  31.              tm2b+@andrew.cmu.edu
  32.  
  33. ----------------------------------------------------------------------
  34.  
  35. Date: 6 Nov 90 20:51:50 GMT
  36. From: julius.cs.uiuc.edu!usc!elroy.jpl.nasa.gov!jato!mars.jpl.nasa.gov!baalke@apple.com  (Ron Baalke)
  37. Subject: Ulysses Update - 11/06/90
  38.  
  39.  
  40.                             ULYSSES STATUS REPORT
  41.                               November 6, 1990
  42.  
  43.      As of 10AM (PST), Sunday, November 4, 1990, the Ulysses spacecraft is
  44. 16,960,000 miles (27,300,000 km) from Earth and 484,863,000 miles
  45. (780,312,000 km) from Jupiter.  The spacecraft is traveling at 89,081 mph
  46. (143,362 kph) relative to the Sun, and 22,900 mph (36,853 kph) relative
  47. to the Earth.
  48.  
  49.      On November 2 the Second Trajectory Correction Maneuver was carried out.
  50. The maneuver was a pulsed radial delta-V maneuver with a duration of one hour
  51. and forty three minutes.  The absolute value of delta-V imparted to the
  52. spacecraft was 3.784 meters/second.
  53.  
  54.      On November 3, the first activity of the day was to switch off the SIM
  55. (Cosmic Rays and Solar Particles) experiment prior to the deployment of the
  56. wire booms.  This was followed by the release of the protective covers of the
  57. Low Energy Charged Particle Experiment (LAN).  The initial switch-on of the
  58. Radio and Plasma Wave Experiment (STO) then took place.  The experiment was
  59. then configured to monitor the deployment.  The on-board X-band downlink was
  60. then switched on to also provide further data on the dynamics of the wire
  61. boom deployment.  Deployment then took place. The deployment procedure
  62. lasted for a total of fifty seven minutes.  Confirmation of a succesful
  63. deployment of both booms was received from the STO experiment team.  Following
  64. the deployment, some reconfigurations of the STO experiment were carried out.
  65. A re-adjustment to the spin rate of the spacecraft was then carried out.
  66.  
  67.      The final activity of the day was to switch off the X-band downlink to
  68. maintain a desired thermal environment on board.  The X-band downlink will be
  69. restored on November 15.
  70.  
  71.      On November 4, the first activity was to configure the STO experiment to
  72. monitor the axial boom deployment.  The axial boom was then deployed. The
  73. deployment procedured lasted for eleven minutes.  The STO experiment reported
  74. a full deployment of the axial boom.  The HED (Magnetic Field) experiment was
  75. then switched off to enable the STO experiment to measure background
  76. environment with HED switched off.
  77.  
  78.      Switch-on of the experiments then re-commenced.  The first switch-on to
  79. occur was the KEP (Energetic Particles and Interstellar Neutral Gas)
  80. experiment.  This activity was followed by the HED experiment which in turn
  81. was followed by the SIM experiment.
  82.  
  83.      Several hours after the axial boom deployment had been carried out, the
  84. build-up of a nutation-like motion was observed.  The motion finally stabilised
  85. at an amplitude of approximately 0.4 degrees.  The phenomena is under
  86. investigation.
  87.  
  88.      Today, the Solar Wind Ion Composition Experiment (GLG) switch-on will take
  89. place.  This will be interleaved with the monitoring and control of the
  90. experiments which have already been switched on.  The GLG checkout will
  91. continue on through tomorrow.  On November 8, on-board tape recorder tests
  92. will commence.  On November 9, the Solar X-rays and Cosmic-ray Bursts
  93. Experiment (HUS) switch-on will take place.
  94.       ___    _____     ___
  95.      /_ /|  /____/ \  /_ /|
  96.      | | | |  __ \ /| | | |      Ron Baalke         | baalke@mars.jpl.nasa.gov
  97.   ___| | | | |__) |/  | | |___   Jet Propulsion Lab | baalke@jems.jpl.nasa.gov
  98.  /___| | | |  ___/    | |/__ /|  M/S 301-355        |
  99.  |_____|/  |_|/       |_____|/   Pasadena, CA 91109 |
  100.  
  101. ------------------------------
  102.  
  103. Date: 6 Nov 90 23:49:25 GMT
  104. From: sdd.hp.com!elroy.jpl.nasa.gov!jato!mars!baalke@ucsd.edu  (Ron Baalke)
  105. Subject: Re: You Can't Expect a Space Station to be Cheap
  106.  
  107. In article <1990Nov4.062813.29481@zoo.toronto.edu> henry@zoo.toronto.edu (Henry Spencer) writes:
  108. >In article <0093F2DB.F2D56F60@KING.ENG.UMD.EDU> sysmgr@KING.ENG.UMD.EDU (Doug Mohney) writes:
  109. >>>>building a large platform which people can live and work in...
  110. >>>
  111. >>>Quite true.  Of course, by this standard, most of the NASA centers involved
  112. >>>in the space station are incompetent for the job too, since only one (MSFC)
  113. >>>has ever built anything like this before...
  114. >>
  115. >>JPL qualifies. ...
  116. >
  117. >???  They've never built a manned spacecraft at all, and as far as I recall
  118. >offhand they have zero experience in "large platform" work.  Their normal
  119. >line of work -- unmanned deep-space exploration -- is as far from space
  120. >stations as you can get and still be in space.
  121. >-- 
  122.  
  123. JPL is involved with the Space Station program.  A JPL Systems Office has
  124. been opened in Reston, Virginia to support the Space Station.  The office
  125. is made up of a professional staff hired from around the Washington, D.C.
  126. area, and from JPL employees relocated from Pasadena.  JPL had traditionally
  127. worked with unmanned deep space mission, and will continue to do so, but it
  128. also expected expand their experience base to support nonrobotic spaceflight
  129. components by being involved with the Space Station and the Space
  130. Exploration Initiative.  Specifically, JPL will be working with the station's
  131. communciations and tracking system, including ensuring the integrity of
  132. the design as it relates to the entire end-to-end space to ground 
  133. communications systems.  JPL is also developing a derivative of the Spacelab
  134. Drop Physics Module for the Space Station.
  135.       ___    _____     ___
  136.      /_ /|  /____/ \  /_ /|
  137.      | | | |  __ \ /| | | |      Ron Baalke         | baalke@mars.jpl.nasa.gov
  138.   ___| | | | |__) |/  | | |___   Jet Propulsion Lab | baalke@jems.jpl.nasa.gov
  139.  /___| | | |  ___/    | |/__ /|  M/S 301-355        |
  140.  |_____|/  |_|/       |_____|/   Pasadena, CA 91109 |
  141.  
  142. ------------------------------
  143.  
  144. Date: 7 Nov 90 06:04:05 GMT
  145. From: serre@boulder.colorado.edu  (SERRE GLENN)
  146. Subject: Re: Galileo Update - 11/06/90
  147.  
  148. In article <1990Nov6.203112.23639@jato.jpl.nasa.gov> baalke@mars.jpl.nasa.gov (Ron Baalke) writes:
  149. >     A NO-OP command was sent yesterday to the Galileo spacecraft to reset
  150. >the Command Loss Timer to 216 hours.  A MAG (Magnetometer) instrument
  151.  
  152. I think this was posted before, but I forgot and my coworkers keep asking:
  153. "What is the Command Loss Timer, and why does it need to be reset?"
  154.  
  155. Email please (unless it hasn't been posted before) and Thanks in Advance. 
  156.  
  157.  
  158. --Glenn Serre
  159. serre@tramp.colorado.edu
  160.  
  161. ------------------------------
  162.  
  163. Date: 6 Nov 90 22:50:42 GMT
  164. From: swrinde!zaphod.mps.ohio-state.edu!usc!elroy.jpl.nasa.gov!jato!mars.jpl.nasa.gov!baalke@ucsd.edu  (Ron Baalke)
  165. Subject: Magellan Update - 11/06/90
  166.  
  167.  
  168.                            MAGELLAN STATUS REPORT
  169.                               November 6, 1990
  170.  
  171.      The Magellan spacecraft is in good health as it exits the Superior
  172. Conjunction phase.  At the Go/No Go meeting yesterday it was decided to resume
  173. mapping at the earliest opportunity.  The command sequence will be sent to the
  174. spacecraft late today and will start execution at 4:20 AM (PST) tomorrow
  175. morning with orbit #765.
  176.  
  177.      Several attempts were required this morning to upload a series of
  178. commands which reconfigure the spacecraft for mapping.  This is believed to be
  179. a Superior Conjunction effect because the Sun-Earth-Magellan angle is only 1.4
  180. degrees.
  181.  
  182.      Good downlink communications have been maintained partially because the
  183. DSN (Deep Space Network) can broaden the bandwidth of the receiver, but the
  184. spacecraft does not have similar adjustments to its command receiver to improve
  185. the uplink.  The radar sensor remains in excellent condition and ready for
  186. mapping.
  187.  
  188.      Nine standard and seven special image swaths were produced by the SAR
  189. (Synthetic Aperture Radar) Data Processor.  The special image swaths involved
  190. reprocessing of the polar area from early orbits to obtain the improved quality
  191. made possible by the recent change to the topographic model used by the
  192. processor.
  193.       ___    _____     ___
  194.      /_ /|  /____/ \  /_ /|
  195.      | | | |  __ \ /| | | |      Ron Baalke         | baalke@mars.jpl.nasa.gov
  196.   ___| | | | |__) |/  | | |___   Jet Propulsion Lab | baalke@jems.jpl.nasa.gov
  197.  /___| | | |  ___/    | |/__ /|  M/S 301-355        |
  198.  |_____|/  |_|/       |_____|/   Pasadena, CA 91109 |
  199.  
  200. ------------------------------
  201.  
  202. Date: Tue, 6 Nov 90 12:21:37 -0500
  203. From: "Allen W. Sherzer" <aws@iti.org>
  204. Subject: Re: LLNL Astronaut Delivery (was Re: You Can't Expect a Space Station)
  205. Newsgroups: sci.space
  206. Cc: 
  207.  
  208. In article <44579@eerie.acsu.Buffalo.EDU>:
  209. >>>How *is* LLNL planning to get astronauts up to the station?  
  210. >>+Put a capsule on a Delta.
  211.  
  212. >Is LNLL sure the Delta can be made man-rated? Cheaply? 
  213.  
  214. LLNL has no intention of man-rating whatever launchers they use. Since
  215. the operational record of Titan and Delta is better than the Shuttle's
  216. operational record and about equal to outside estimates of Shuttle
  217. reliability there seems little point. Man rating adds cost but doesn't
  218. add reliability.
  219.  
  220. >Just throwing a
  221. >capsule on top of a Delta doesn't sound particularly safe. I know
  222. >Delta has a great launch record, but I doubt it was ever designed
  223. >for manned-flight.
  224.  
  225. If the vibration load on the crew isn't too bad, why not?
  226.  
  227. Consider two hypothetical launchers. One man rated which kills about
  228. 10% of the crews who fly on it in 100 flights. Another is not man-
  229. rated and kills about 5% of the crews who fly on it in 100 flights.
  230. Which would you rather fly on?
  231.  
  232. Now suppose that in 100 flights two other launch vehicles kill ~2%
  233. of their crews (again, one is man-rated and the other isn't). The
  234. man rated one costs four times as much to fly as the non rated one.
  235. Which would you rather fly (assuming you are paying for the ticket)?
  236.  
  237. I myself would fly the non man-rated launcher in both cases.
  238.  
  239.   Allen
  240.  
  241. -- 
  242. +---------------------------------------------------------------------------+
  243. |Allen W. Sherzer| I had a guaranteed military sale with ED-209. Renovation |
  244. |   aws@iti.org  | programs, spare parts for 25 years. Who cares if it      |
  245. |                | works or not?  - Dick Jones, VP OCP Security Concepts    |
  246.  
  247. ------------------------------
  248.  
  249. Date: Tue, 6 Nov 90 14:40:50 -0500
  250. From: "Allen W. Sherzer" <aws@iti.org>
  251. Subject: Re: LLNL Astronaut Delivery
  252. Newsgroups: sci.space
  253. Cc: 
  254.  
  255. In article <70202@iuvax.cs.indiana.edu>:
  256. >>If the vibration load on the crew isn't too bad, why not? [send people on
  257. >>a Delta]
  258.  
  259. >its not just vibration load (which is probably too bad) 
  260.  
  261. Or it may not be too bad. Anybody know for sure?
  262.  
  263. >its also the acceleratation.  
  264. >Most of the payload rockets made have way too high
  265. >acceleration rates for humans....even with gsuits/seats/etc..
  266.  
  267. So what are the max Gs for Delta and Titan?
  268.  
  269. Tell you what, if you object to the solids we will use an Atlas.
  270. It's a bit more expensive but it doesn't use solids, lifts more
  271. than a Delta, and variants have flown men before.
  272.  
  273. >sure, a chunk of metal and silicon can take it, but not a human....
  274.  
  275. You may be right but so far it is unproven.
  276.  
  277.       Allen
  278. -- 
  279. +---------------------------------------------------------------------------+
  280. |Allen W. Sherzer| I had a guaranteed military sale with ED-209. Renovation |
  281. |   aws@iti.org  | programs, spare parts for 25 years. Who cares if it      |
  282. |                | works or not?  - Dick Jones, VP OCP Security Concepts    |
  283.  
  284. ------------------------------
  285.  
  286. Date: 6 Nov 90 19:21:38 GMT
  287. From: trident.arc.nasa.gov!yee@ames.arc.nasa.gov  (Peter E. Yee)
  288. Subject: Payload Status for 11/05/90 (Forwarded)
  289.  
  290.  
  291.     Daily Status/KSC Payload Management and Operations 11-05-90
  292.     
  293.     
  294.     - STS-35 ASTRO-1/BBXRT (at Pad-B)
  295.     
  296.     Experiment monitoring continues.
  297.     
  298.     
  299.     - STS-39 AFP-675/IBSS/STP-01 (at CCAFS)
  300.     
  301.     CITE preps continue at the VPF.
  302.     
  303.     
  304.     - STS-40 SLS-1 (at O&C)
  305.     
  306.     Module closeouts will continue today along with MVAK
  307.     training and preps for the offgassing test.
  308.     
  309.     
  310.     - STS-37 GRO (at PHSF)
  311.     
  312.     A CITE MMU load will be performed today.
  313.     
  314.     
  315.     - STS-42 IML-1 (at O&C)
  316.     
  317.     Paper closure will be active today.
  318.     
  319.     
  320.     - STS-45 Atlas-1 (at O&C)
  321.     
  322.     Experiment and pallet staging continue.
  323.     
  324.     
  325.     - STS-46 TSS-1 (at O&C)
  326.     
  327.     Power on active thermal control systems checks continue.
  328.     
  329.     
  330.     - STS-47 Spacelab-J (at O&C)
  331.     
  332.     Rack staging continues.
  333.     
  334.     
  335.     - STS-67 LITE-1 (at O&C)
  336.     
  337.     No work is scheduled for today.
  338.  
  339. ------------------------------
  340.  
  341. Date: 7 Nov 90 05:03:05 GMT
  342. From: sumax!polari!crad@beaver.cs.washington.edu  (Charles Radley)
  343. Subject: Re: LLNL Astronaut Delivery (was Re: You Can't Expect a Space Station)
  344.  
  345.  
  346. In article <2666@polari.UUCP>:
  347. >Soyuz is not available, 
  348. +Yes it is. I spoke with a vice president of Space Commerce Inc. recently.
  349. +He told me that for $50M he +would deliver you a Soyuz. I'm sure you could
  350. +also get a quanity discount.
  351. -
  352. That is not the problem.     US State Department technology
  353. restrictions prohibit hi-tech co-operation with the Soviets.   US
  354. aerospace companies and government agencies are not allowed to send
  355. their employees to the USSR without an export license, which is
  356. virtually impossible to get (with one exception, Payloads Systems Inc
  357. managed to slip through the net and flew an experiment on Mir.   The
  358. net has subsequently been tightened).
  359. And US companies and government agencies are not allowed to permit
  360. Soviet citizens to enter sites where aerospace work is being done.
  361.   So you will get your Soyuz and maybe some manuals in Russian.
  362. But nobody in the west will know how to launch or fly the thing, and
  363. nobody from the USSR will be allowed to train the US personnel.
  364.   If you don't believe me, ask the Australian Cape York Space Agency
  365. what is giving them their biggest headache.....they want to get a US
  366. company to operate Soviet Zenit launch vehicles, and the US State
  367. Dept is saying - "forget it !"
  368. -
  369.  
  370. >how can LLNL have it in their plan?
  371. +They don't as far as I know. I am only demonstrating that it can be done.
  372. -
  373. So what DO they propose ?
  374.  
  375. +Also, for $2 to 3 billion (assuming your numbers are correct) you could
  376. +build and launch ~5 Earth Stations. If the first one fails, the second
  377. +one will. This second one will be built and launched for less than the cost
  378. +of ONE shuttle flight.
  379. -
  380. I guess that is the cheapest approach, if you believe the costs.
  381. But they will still need a $ 2 - 3 B crew shuttle and ACRV, it really
  382. cannot be done for less, it needs to stand high G, re-entry, etc.
  383. Non-trivial engineering issues.
  384.  
  385. >Remember you need long
  386. >duration EVA, it may take a couple of weeks to get a failed LLNL
  387. >fully deployed.
  388. +Or it might not. Skylab didn't need two weeks.
  389. -
  390. They were lucky.   They did have two week capability if it had proven
  391. necessary.
  392.  
  393. >  If we had access to Soyuz and Soviet technology, the cheapest
  394. >approach would be to scrap LLNL and use Mir.
  395. +Mir does not provide artificial gravity. It is also not clear that
  396. +the Soviets would sell it (after all, it is starting to show a profit).
  397. -
  398. Now you are contradicting yourself.   You said congress wants a
  399. microgravity facility and criticised NASA for "adding the kitchen
  400. sink".   Then you advocate a LLNL where artifical gravity eliminates
  401. all microgravity research capability........Artifical gravity is
  402. neither necessary, nor helpful, for an Earth orbit station, where
  403. crews are rotated every 90 days.
  404.  
  405. ------------------------------
  406.  
  407. End of SPACE Digest V12 #534
  408. *******************
  409.